Art 1- Continuing their Still Life Drawings. They will be due tomorrow at the end of class.
Art 2- Continuing their Still Life Drawings- then they are to Watercolor them.
UIL grade updates were this past weekend.
Tuesday, February 19, 2013
Wednesday, February 13, 2013
Updated Journal Check
Journal Check will be this Friday, February 15 instead of last week. So a completion of weeks 1-6 will be graded for a formative grade. Journal entries may be found in the Journal tab.
Monday, February 11, 2013
Week of Feb 11
Art 1- today is the last day to work on their Design Project.
Both Art 1 & 2- starting a Still-life project. Art 1 will draw it out and use shading techniques to finish it.
Art 2 will draw then use Watercolors to finish it out.
Both Art 1 & 2- starting a Still-life project. Art 1 will draw it out and use shading techniques to finish it.
Art 2 will draw then use Watercolors to finish it out.
Tuesday, February 5, 2013
Grades
Grades have been uploaded for Progress Reports. Only a handful of students turned in missing work today. 1 person came in after school to work on something. The other 6 that said they were coming to work didn't show up. Grades were posted yesterday in class to show what was missing. Just an FYI. Oh and Art 2 students... Your Charcoal project, just a reminder- it's worth 2 Summative grades since we are going into week 4 of this assignment.
Monday, February 4, 2013
Week of Feb 4
Art 1- students are continuing their Design Projects.
Grades are being put into the system today for Portraits and for their Design handouts.
Art 2- Charcoal projects are due this Friday. I will be taking two Summative grades for this project, since we have taken so long on them.
Journal Check will be this Friday for all classes. Formative Grade for now, then a Summative grade will be given at the of the 9 weeks.
Grades are being put into the system today for Portraits and for their Design handouts.
Art 2- Charcoal projects are due this Friday. I will be taking two Summative grades for this project, since we have taken so long on them.
Journal Check will be this Friday for all classes. Formative Grade for now, then a Summative grade will be given at the of the 9 weeks.
Wednesday, January 30, 2013
This week
ART ONE: Portrait Projects were due yesterday by the end of class. If students were absent during this project, they will need to make time to come in during tutoring times to do get caught up.
ART TWO: There was a Charcoal Project check yesterday/today. Students were to be to the point of erasing out their details by yesterday. If they weren't to this point, they didn't receive the full credit.
Today, Art 1 are practicing/Brainstorming designs and patterns for their next project.
{GRADES WERE POSTED LAST TUESDAY IN CLASS, I have only received a couple projects from those students who were missing something}
ART TWO: There was a Charcoal Project check yesterday/today. Students were to be to the point of erasing out their details by yesterday. If they weren't to this point, they didn't receive the full credit.
Today, Art 1 are practicing/Brainstorming designs and patterns for their next project.
{GRADES WERE POSTED LAST TUESDAY IN CLASS, I have only received a couple projects from those students who were missing something}
Monday, January 21, 2013
Week of January 21
Tuesday-Friday: All Students/Classes are to continue with their portrait projects.
GRADES!!! Grades have been updated. These grades are reflected from projects/participation as of Friday, Jan 18. Grades will be posted in class Tuesday for students to see what they are missing. Art 2 students work from Friday while I was out and had a sub, will be graded tomorrow and added as soon as I can.
I hope everyone reading this is doing well. The Flu bug made her visit with my family and hit both my daughter and myself. I was not able to make it as a chaperone on Friday's field trip. But I am feeling better and my daughter has been free from fever for over 24 hours, so I hope to be at work tomorrow. Being sick is the pits and I missed my students!
GRADES!!! Grades have been updated. These grades are reflected from projects/participation as of Friday, Jan 18. Grades will be posted in class Tuesday for students to see what they are missing. Art 2 students work from Friday while I was out and had a sub, will be graded tomorrow and added as soon as I can.
I hope everyone reading this is doing well. The Flu bug made her visit with my family and hit both my daughter and myself. I was not able to make it as a chaperone on Friday's field trip. But I am feeling better and my daughter has been free from fever for over 24 hours, so I hope to be at work tomorrow. Being sick is the pits and I missed my students!
Subscribe to:
Comments (Atom)



